Fairbairn Road Retarding Basin Embankment Stabilisation and Shared Path

Client: Delcon Civil
Owner: Melbourne Water
Location: Cranbourne

To protect the embankment of the retarding basin, MC Civil and Landscaping was contracted to install over 7000 square metres of geo grid cells secured with soil pins. In the event of a large-scale rain event and storm water surcharge the geo grid was necessary to install to protect any possibility of breach of the embankment. MC Civil also constructed the shared path on top of the embankment that surrounds the reserve.